Covered Walkway Phase 2
Sector: Airport • Location: Eglin Air Force Base, Florida, United States of America
Source: Dodge
Airline Terminal. GC Bids to Owner Public - Local November 25 at 03:00 PM (EDT)
- Status
- Prospective
- Sector
- Airport, Chemical (Industrial), Road, Cement, Warehouse, Metal, Telecommunications, Consumer Products, Rail, Forest Products and Packaging, Power Transmission, Waste Processing and Treatment, Steel, Hospital, Manufacturing (Industrial), Residential, Power Generation (CCGT), Commercial, Water Supply and Storage, Government
- Location
- Eglin Air Force Base, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Covered Walkway Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Airline Terminal. GC Bids to Owner Public - Local November 25 at 03:00 PM (EDT) |
Original sector | Industry, Trade And Services |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Eglin Air Force Base |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Airport, Chemical (Industrial), Road, Cement, Warehouse, Metal, Telecommunications, Consumer Products, Rail, Forest Products and Packaging, Power Transmission, Waste Processing and Treatment, Steel, Hospital, Manufacturing (Industrial), Residential, Power Generation (CCGT), Commercial, Water Supply and Storage, Government |
Article published date | 2026-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
