CP Achiras S.A.
Sector: Wind • Location: Argentina
Source: International Finance Corporation (IFC)
The Achiras wind power project (the “Project”) includes the construction and operation of a 48MW wind power plant, a transformation substation and a 17 kilometer transmission line connecting the plant and its substation to the national grid. The Project is located in the department of Rio Cuarto, near the city of Achiras, in the Province of Córdoba, Argentina. The Project will use 15 Acciona Windp
- Status
- Prospective
- Sector
- Wind, Hydro, Geothermal, Government, Power Generation (CCGT), Road
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about CP Achiras S.A.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Achiras wind power project (the “Project”) includes the construction and operation of a 48MW wind power plant, a transformation substation and a 17 kilometer transmission line connecting the plant and its substation to the national grid. The Project is located in the department of Rio Cuarto, near the city of Achiras, in the Province of Córdoba, Argentina. The Project will use 15 Acciona Windpower AW125/3.2MW wind turbine generators (WTGs), each one linked to the on-site 33kV collector switchgear. The voltage will then be stepped up to a transmission voltage of 132kV at the on-site Project substation and will be evacuated through the Project transmission line which will finally connect to the Villa Mercedes- Rio Cuarto node. The Project will be developed and directly owned by CP Achiras S.A.U. (“CPA”, or the “Company”) a special purpose vehicle organized under the laws of Argentina, predominantly owned on an indirect basis by Central Puerto, S.A. (“CEPU”, the “Sponsor”), Argentina’s largest privately-owned power generation company.The construction of the Project considers a multi-contract approach and as such, the procurement and installation of the wind turbines and the construction of the civil and electrical works are tasks covered under separate agreements between CPA and different contractors or suppliers, ultimately supervised and managed by CEPU and by Ventus acting as owner’s engineer. During operations, Acciona will provide operating and maintenance services to the WTGs and CEPU will provide full corporate, operation and maintenance services to the Project.The Project will sell power through a 20-year Power Purchase Agreement (“PPA”) with the Compañía Administradora del Mercado Mayorista Eléctrico, S.A. (“CAMMESA”), awarded under round 1.5 of Renovar, the new renewable energy program launched by the Government of Argentina in 2016. The PPA with CAMMESA is USD denominated (with payments made in local currency). |
Original sector | V-BC - Wind Power - Renewable Energy Generation |
Budget |
Location
Country | Argentina |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Wind, Hydro, Geothermal, Government, Power Generation (CCGT), Road |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
