CP09 Route 105 Culvert No. 27 Replacement
Bid results · New Brunswick · Last reported Jun 2024
Source: Dodge USA
This project consists of replacing a concrete arch culvert under Route 105 in Riverbank, Parish of Peel. The new culvert will be an 1800 mm diameter reinforced concrete pipe, 26.96 metre in length, set at a 1.00% slope. The work sequence is as follows: -Installing erosion prevention devices and clearing vegetation -Utility moves (if required) -Isolating the work area from stream flow using the pum
- Status
- Closed
- Sector
- Hydro, Power Transmission, Cement, Water Supply and Storage, Road, Waste Processing and Treatment, Consumer Products, Commercial, Government, Power Generation (CCGT)
- Location
- Beechwood, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CP09 Route 105 Culvert No. 27 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of replacing a concrete arch culvert under Route 105 in Riverbank, Parish of Peel. The new culvert will be an 1800 mm diameter reinforced concrete pipe, 26.96 metre in length, set at a 1.00% slope. The work sequence is as follows: -Installing erosion prevention devices and clearing vegetation -Utility moves (if required) -Isolating the work area from stream flow using the pump and dam method -Excavating the road embankment and removing the existing culvert -Installing th... |
Procurement method | |
Budget |
Location
Country | Canada |
State | New Brunswick |
City | Beechwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Transmission, Cement, Water Supply and Storage, Road, Waste Processing and Treatment, Consumer Products, Commercial, Government, Power Generation (CCGT) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
