CP19 Rosehill & CP67 Bluffton Regional Pump Stations
Sector: Water Supply and Storage • Location: Bluffton, South Carolina, United States of America
Source: Dodge USA
Below is a summary of the Scope of Work. A detailed Scope of Work can be found in the CP-19 & CP-67 Upgrades Project Manual (attached Exhibit 7). CP19 (Rose Hill) Work includes construction of one (1) new submersible pump station per BJWSA Regional Station standards located within an existing lagoon, complete with all required piping, electrical, instrumentation and connection points for future co
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
- Location
- Bluffton, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CP19 Rosehill & CP67 Bluffton Regional Pump Stations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Below is a summary of the Scope of Work. A detailed Scope of Work can be found in the CP-19 & CP-67 Upgrades Project Manual (attached Exhibit 7). CP19 (Rose Hill) Work includes construction of one (1) new submersible pump station per BJWSA Regional Station standards located within an existing lagoon, complete with all required piping, electrical, instrumentation and connection points for future construction of one (1) 150,000-gallon storage tank. The self-cleaning wetwell will be designed to ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Bluffton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
