CP19 Rosehill & CP67 Bluffton Regional Pump Stations
Sector: Government • Location: Bluffton, South Carolina, United States of America
Source: Dodge USA
Below is a summary of the Scope of Work. A detailed Scope of Work can be found in the CP-19 & CP-67 Upgrades Project Manual (attached Exhibit 7). CP19 (Rose Hill) Work includes construction of one (1) new submersible pump station per BJWSA Regional Station standards located within an existing lagoon, complete with all required piping, electrical, instrumentation and connection points for future co
- Status
- Closed
- Sector
- Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage
- Location
- Bluffton, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CP19 Rosehill & CP67 Bluffton Regional Pump Stations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Below is a summary of the Scope of Work. A detailed Scope of Work can be found in the CP-19 & CP-67 Upgrades Project Manual (attached Exhibit 7). CP19 (Rose Hill) Work includes construction of one (1) new submersible pump station per BJWSA Regional Station standards located within an existing lagoon, complete with all required piping, electrical, instrumentation and connection points for future construction of one (1) 150,000-gallon storage tank. The self-cleaning wetwell will be designed to ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Bluffton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
