CPS Sidewalk
One of 10,000+ projects Taiyo tracks in Idaho.
Source: Dodge USA
Thescope of this project entails providing all necessary labor, materials, andequipment for the installation of sidewalks and pedestrian ramps along SH 19 andAcademy Drive. This involves the removal of existing sidewalk, curb, drivewaysand pedestrian ramps, followed by the installation of new concrete curb,sidewalk, driveways and pedestrian ramps, along with any other specified tasksoutlined in th
- Status
- Closed
- Sector
- Cement, Road, Car parking, Automotive, Government, Commercial
- Location
- Greenleaf, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CPS Sidewalk
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Thescope of this project entails providing all necessary labor, materials, andequipment for the installation of sidewalks and pedestrian ramps along SH 19 andAcademy Drive. This involves the removal of existing sidewalk, curb, drivewaysand pedestrian ramps, followed by the installation of new concrete curb,sidewalk, driveways and pedestrian ramps, along with any other specified tasksoutlined in the project manual. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Greenleaf |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Automotive, Government, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
