CR 108 Hartland Road Bridge Replacement
Sector: Water Supply and Storage • Location: Royalton, New York, United States of America
Source: Dodge USA
he work will include the complete removal and replacement of the existing bridge with a concrete three-sided frame structure with the 28-ft long clear-span units. Proposed roadway work will be limited to approach pavement reconstruction to accommodate the new culvert
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | he work will include the complete removal and replacement of the existing bridge with a concrete three-sided frame structure with the 28-ft long clear-span units. Proposed roadway work will be limited to approach pavement reconstruction to accommodate the new culvert |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
