logo

CR 11/DOVE-DRAKE ROAD @ MILL SHOAL CREEK 10 MI N OF COMER

Sector: Water Supply and Storage • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This bridge (195-5003-0; Dove Drake Road over Mill Shoal Creek) was built in 1962. This bridge consists of 3 spans of steel girders, on H-pile bents supporting steel caps. The bridge design loading is unknown. This bridge is posted for load restriction and is scour critical. One beam has a web tear and bottom flange burned from welding. In addition, other defects observed were bent flanges,

Project Information FAQ

Project Information

4 Q
The project “CR 11/DOVE-DRAKE ROAD @ MILL SHOAL CREEK 10 MI N OF COMER” is an infrastructure initiative in the Water Supply and Storage sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This bridge (195-5003-0; Dove Drake Road over Mill Shoal Creek) was built in 1962. This bridge consists of 3 spans of steel girders, on H-pile bents supporting steel caps. The bridge design loading is unknown. This bridge is posted for load restriction and is scour critical. One beam has a web tear and bottom flange burned from welding. In addition, other defects observed were bent flanges, attachments ripped off, and incomplete splices from construction. One beam is slightly out of plum and slightly rotated. Heavy sheet corrosion is present at the cap webs and piles within the water zone. All piles in the water zone have section loss in the webbing and flanges. High water scour and lateral bank erosion was observed at span 1. Due to the condition of this bridge, load restriction, and scour criticality, replacement is necessary.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data