logo

CR 120/HOWELL ROAD @ CONNELL BRANCH 1.5 MI E OF HOWELL

Sector: Power Transmission • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project will construct a replacement bridge for the existing bridge over Connell Branch. The preferred alternative proposes to build the replacement bridge on the existing alignment and divert traffic to an offsite detour during construction. The offsite detour will utilize SR 38/US 84, SR 135, and SR 11/US 129. The detour route length is 18.3 MI; an increase of 15.1 MI from the no

Project Information FAQ

Project Information

4 Q
The project “CR 120/HOWELL ROAD @ CONNELL BRANCH 1.5 MI E OF HOWELL” is an infrastructure initiative in the Power Transmission sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project will construct a replacement bridge for the existing bridge over Connell Branch. The preferred alternative proposes to build the replacement bridge on the existing alignment and divert traffic to an offsite detour during construction. The offsite detour will utilize SR 38/US 84, SR 135, and SR 11/US 129. The detour route length is 18.3 MI; an increase of 15.1 MI from the normal route length. The detour adds 17 minutes to the travel time. The typical section consists of two (2) – 11-ft lanes with a 4-ft shoulder along the roadway. The approximate project length is 0.2 MI. The preferred alternative does not impact the intersection of CR 120/Howell Road with Valentine Road. The proposed profile will be raised by approximately 2-ft to increase the flat longitudinal slope to above the minimum, 0.5%, and locate the low point off the proposed bridge The proposed right-of-way (ROW) width will increase from 100-ft to 150-ft. Major Structures:

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data