CR 129 Road Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
For 07-25 Roadway Improvements to: CR 129 (FM 756 TO CR 113), ROAD IMPROVEMENTS: 1. Preparation of Right-of-way shall consist of cleaning the edges of the roadway and removal of vegetation. 2. Rework the existing pavement structure within the limits as designated and/or as directed by the County Engineer. Initial rework of the existing asphalt pavement and base material shall be to a total depth o
- Status
- Closed
- Sector
- Consumer Products, Government, Power Transmission, Power Generation (CCGT), Road, Commercial
- Location
- Tyler, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CR 129 Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | For 07-25 Roadway Improvements to: CR 129 (FM 756 TO CR 113), ROAD IMPROVEMENTS: 1. Preparation of Right-of-way shall consist of cleaning the edges of the roadway and removal of vegetation. 2. Rework the existing pavement structure within the limits as designated and/or as directed by the County Engineer. Initial rework of the existing asphalt pavement and base material shall be to a total depth of eight inches (8 ) utilizing Item 251, Type D. 3. Cement treatment of the scarified area shall b... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Tyler |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Government, Power Transmission, Power Generation (CCGT), Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
