logo
ProjectComplete

CR 145/CRUMPS BRIDGE ROAD @ NORTH FORK BROAD RIVER

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

Bridge Replacement of CR 145 (Crumps Bridge Road) over North Fork Broad River. This bridge is deficient and requires posting due to insufficient flexural capacity of the steel superstructure. The project length is approximately 0.17 miles long. The project begins approximately 300 feet west of the existing bridge and ends approximately 450 feet east of the existing bridge. The proposed typical se

Status
Closed
Sector
Bridge, Power Transmission, Road, Steel, Government, Metal, Power Generation (CCGT)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CR 145/CRUMPS BRIDGE ROAD @ NORTH FORK BROAD RIVER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CR 145/CRUMPS BRIDGE ROAD @ NORTH FORK BROAD RIVER” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge Replacement of CR 145 (Crumps Bridge Road) over North Fork Broad River. This bridge is deficient and requires posting due to insufficient flexural capacity of the steel superstructure. The project length is approximately 0.17 miles long. The project begins approximately 300 feet west of the existing bridge and ends approximately 450 feet east of the existing bridge. The proposed typical section would consist of two 10-foot travel lanes (one in each direction) with 4-foot shoulders and rural side ditches. The bridge will be replaced along the existing alignment; therefore, an offsite detour will be utilized during construction. Construction duration is expected to be 9 months.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Power Transmission, Road, Steel, Government, Metal, Power Generation (CCGT)

Article published date

2024-03-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project