logo

CR 145/CRUMPS BRIDGE ROAD @ NORTH FORK BROAD RIVER

Sector: Power Transmission • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Bridge Replacement of CR 145 (Crumps Bridge Road) over North Fork Broad River. This bridge is deficient and requires posting due to insufficient flexural capacity of the steel superstructure. The project length is approximately 0.17 miles long. The project begins approximately 300 feet west of the existing bridge and ends approximately 450 feet east of the existing bridge. The proposed typical se

Project Information FAQ

Project Information

3 Q
The project “CR 145/CRUMPS BRIDGE ROAD @ NORTH FORK BROAD RIVER” is an infrastructure initiative in the Power Transmission sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bridge Replacement of CR 145 (Crumps Bridge Road) over North Fork Broad River. This bridge is deficient and requires posting due to insufficient flexural capacity of the steel superstructure. The project length is approximately 0.17 miles long. The project begins approximately 300 feet west of the existing bridge and ends approximately 450 feet east of the existing bridge. The proposed typical section would consist of two 10-foot travel lanes (one in each direction) with 4-foot shoulders and rural side ditches. The bridge will be replaced along the existing alignment; therefore, an offsite detour will be utilized during construction. Construction duration is expected to be 9 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data