CR 1529/COCHRAN ROAD @ CAMP CREEK
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The proposed project will replace the bridge carrying CR 1529 (Cochran Road) over Camp Creek in its current location. The project begins 220 ft. southwest of the existing bridge and ends 200 ft. northeast of the existing bridge. The existing bridge will be demolished and a new bridge constructed on the existing alignment. The proposed mainline will consist of two 11’-0” travel lanes with cur
- Status
- Under Construction
- Sector
- Car parking, Bridge, Cement, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 1529/COCHRAN ROAD @ CAMP CREEK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will replace the bridge carrying CR 1529 (Cochran Road) over Camp Creek in its current location. The project begins 220 ft. southwest of the existing bridge and ends 200 ft. northeast of the existing bridge. The existing bridge will be demolished and a new bridge constructed on the existing alignment. The proposed mainline will consist of two 11’-0” travel lanes with curb and gutter in each direction. Sidewalks will be constructed in each direction for the length of the project. A 2.0’ stamped concrete buffer will be provided between the sidewalk and curb. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Bridge, Cement, Road, Government, Automotive |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
