logo

CR 160/HALLS BRIDGE ROAD @ WEST FORK YAM GRANDY CREEK

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This bridge (107-5058-0; Halls Bridge Road over West Fork Yam Grandy Creek) was built in 1920. This bridge consists of 2 spans of concrete deck on concrete piles supporting concrete caps. This bridge was designed for an H 10 vehicle. This bridge is posted for reduced loads and is scour critical. Moderate scaling and spalling is present throughout the top of the bridge deck. A large portion o

Project Information FAQ

Project Information

3 Q
The project “CR 160/HALLS BRIDGE ROAD @ WEST FORK YAM GRANDY CREEK” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This bridge (107-5058-0; Halls Bridge Road over West Fork Yam Grandy Creek) was built in 1920. This bridge consists of 2 spans of concrete deck on concrete piles supporting concrete caps. This bridge was designed for an H 10 vehicle. This bridge is posted for reduced loads and is scour critical. Moderate scaling and spalling is present throughout the top of the bridge deck. A large portion of the deck is either delaminated or spalled with exposed rebar. On the underside of the deck are large spalls in both spans with exposed rebar. The exposed rebar has corrosion swell and surface rust. The piles at bent 2 have severe scale/abrasion below the cap all the way down. In addition, the left forward wing wall has heavy deterioration and scour with undermining. Due to the condition of this bridge, load striction, and scour criticality, replacement is necessary.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data