CR 184 Box Culvert Replacement
Sector: Water Supply and Storage • Location: Le Ray Township, Minnesota, United States of America
Source: Dodge
CR 184 Box Culvert Replacement--CR 184 Culvert Replacement and Grading County Project CP 2184 The major items of work are approximately: QTY UNIT. Description 0.12 ACRE Clearing & Grubbing 48 LF Sawing Pavement (Full Depth) 125 LF Remove Pipe Culverts 663 SY Remove Bituminous Pavement 1 LS Remove Miscellaneous Structures 394 CY Excavation Common (P) 1022 CY Common Embankment (CV) (P) 20 TON Aggreg
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Road, Government
- Location
- Le Ray Township, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CR 184 Box Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CR 184 Box Culvert Replacement--CR 184 Culvert Replacement and Grading County Project CP 2184 The major items of work are approximately: QTY UNIT. Description 0.12 ACRE Clearing & Grubbing 48 LF Sawing Pavement (Full Depth) 125 LF Remove Pipe Culverts 663 SY Remove Bituminous Pavement 1 LS Remove Miscellaneous Structures 394 CY Excavation Common (P) 1022 CY Common Embankment (CV) (P) 20 TON Aggregate Surfacing Class 2 205 TON Aggregate Base Class 5 60 TON Shoulder Base Aggregate Class 1 245 T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Le Ray Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Road, Government |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
