logo

CR 185/ASBURY ROAD @ CLEAR CREEK

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project would replace the bridge on CR 185/Asbury Road over Clear Creek in Wilkinson County. The project consists of replacement of an existing structurally deficient bridge located on County Road 185/ Asbury Church Road at Clear Creek in Wilkinson County. The proposed typical section of County Road 185 is composed of two 11-ft paved travel lanes (one in each direction) with 4-ft shoulders an

Project Information FAQ

Project Information

4 Q
The project “CR 185/ASBURY ROAD @ CLEAR CREEK” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project would replace the bridge on CR 185/Asbury Road over Clear Creek in Wilkinson County. The project consists of replacement of an existing structurally deficient bridge located on County Road 185/ Asbury Church Road at Clear Creek in Wilkinson County. The proposed typical section of County Road 185 is composed of two 11-ft paved travel lanes (one in each direction) with 4-ft shoulders and rural side ditches and fill slopes. The proposed bridge (TBD) (one in each direction) and (TBD) shoulders. County Road 185 will be closed during construction. An off-site detour will be designated for this project for approximately six months. The total length of this project is approximately 0.06 miles. No right-of-way or permanent easement is anticipated for this project. This project is being designed and constructed under the Low-Impact Bridge Program (LIBP).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data