logo

CR 185/ASBURY ROAD @ CLEAR CREEK

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project would replace the bridge on CR 185/Asbury Road over Clear Creek in Wilkinson County. The project consists of replacement of an existing structurally deficient bridge located on County Road 185/ Asbury Church Road at Clear Creek in Wilkinson County. The proposed typical section of County Road 185 is composed of two 11-ft paved travel lanes (one in each direction) with 4-ft shoulders an

Status
Under Construction
Sector
Bridge, Road
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CR 185/ASBURY ROAD @ CLEAR CREEK

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “CR 185/ASBURY ROAD @ CLEAR CREEK” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project would replace the bridge on CR 185/Asbury Road over Clear Creek in Wilkinson County. The project consists of replacement of an existing structurally deficient bridge located on County Road 185/ Asbury Church Road at Clear Creek in Wilkinson County. The proposed typical section of County Road 185 is composed of two 11-ft paved travel lanes (one in each direction) with 4-ft shoulders and rural side ditches and fill slopes. The proposed bridge (TBD) (one in each direction) and (TBD) shoulders. County Road 185 will be closed during construction. An off-site detour will be designated for this project for approximately six months. The total length of this project is approximately 0.06 miles. No right-of-way or permanent easement is anticipated for this project. This project is being designed and constructed under the Low-Impact Bridge Program (LIBP).

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project