CR 1/PATEVILLE RD; CR 468/10TH ST & CS 624/25TH AVE @ 3 LOCS
Sector: Cement • Location: Cordele, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Cordele 10th Street South Pedestrian Corridor:
-
8th Street from 24th Avenue to 28th Avenue (west side of street only, 0.265 mi). Existing ROW width of 60'. Easements required.
-
10th Street from 24th Avenue to 28th Avenue (both sides of street, 0.294 mi). Existing ROW width of 40-45'. Easements required.
-
13th Street from 24th Avenue to 27th avenue (east side of street only, 0.224
- Status
- Closed
- Sector
- Cement, Road, Water Supply and Storage, Car parking, Automotive, Government
- Location
- Cordele, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 1/PATEVILLE RD; CR 468/10TH ST & CS 624/25TH AVE @ 3 LOCS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cordele 10th Street South Pedestrian Corridor: 1. 8th Street from 24th Avenue to 28th Avenue (west side of street only, 0.265 mi). Existing ROW width of 60'. Easements required. 2. 10th Street from 24th Avenue to 28th Avenue (both sides of street, 0.294 mi). Existing ROW width of 40-45'. Easements required. 3. 13th Street from 24th Avenue to 27th avenue (east side of street only, 0.224 mi). Existing ROW width of 80'. No easements required. All three streets will have 5'-wide concrete sidewalks and 24" curb & gutter installed. No pedestrian lights, landscaping, or irrigation is included in this project. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Cordele |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Water Supply and Storage, Car parking, Automotive, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
