logo

CR 21/HAPPY VALLEY CIRCLE @ BROWNS CREEK 6 MI N OF NEWNAN

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

Bridge Replacement @ CR 21/HAPPY VALLEY ROAD @ BROWNS CREEK 6 MI N OF NEWNAN

The purpose of this project is to replace the bridge on CR21/ Happy Valley Road over Browns Creek in the Coweta County, located 6 miles north of Newnan, GA. Existing Right of way is 80 ft. Proposed Right of way varies from 80 ft to 110 ft. The total length of the project is approximately 0.16 miles beginning 420 ft sou

Project Information FAQ

Project Information

4 Q
The project “CR 21/HAPPY VALLEY CIRCLE @ BROWNS CREEK 6 MI N OF NEWNAN” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bridge Replacement @ CR 21/HAPPY VALLEY ROAD @ BROWNS CREEK 6 MI N OF NEWNAN The purpose of this project is to replace the bridge on CR21/ Happy Valley Road over Browns Creek in the Coweta County, located 6 miles north of Newnan, GA. Existing Right of way is 80 ft. Proposed Right of way varies from 80 ft to 110 ft. The total length of the project is approximately 0.16 miles beginning 420 ft south of the existing bridge abutment and ending 380 ft north of the existing bridge abutment. The proposed project consists of constructing a new bridge over Browns Creek that is approximately 60 ft long and 40’- 1” ft wide that will be constructed at the current location along the existing roadway centerline. Traffic will utilize an off-site detour during construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data