CR 228/FS 236/FH 42 @ COOPER CREEK 10.3 MI SW OF BLAIRSVILLE
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This project consists of replacing the existing bridge on Cooper Creek Rd. The total project lenght is .20 miles. This road runs through the Chattahoochee National Forest. The existing bridge was built in 1958 and is 39 feet long. It has a sufficeny rating of 56.7. The bridge is being replaced with a 48 foot long, double span 24 X 9 bottomless culvert. This is a FOS project.
- Status
- Closed
- Sector
- Bridge, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 228/FS 236/FH 42 @ COOPER CREEK 10.3 MI SW OF BLAIRSVILLE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of replacing the existing bridge on Cooper Creek Rd. The total project lenght is .20 miles. This road runs through the Chattahoochee National Forest. The existing bridge was built in 1958 and is 39 feet long. It has a sufficeny rating of 56.7. The bridge is being replaced with a 48 foot long, double span 24 X 9 bottomless culvert. This is a FOS project. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
