logo

CR 2373/FLOYD RD FROM SILVER COMET TRAIL TO CR 2894/HICKS RD

Sector: Water Supply and Storage • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

CR 2373/Floyd Rd from Silver Comet Trail to CR 2894/Hicks Rd: along CR 2373/Floyd Rd from CR 2894/Hicks Rd to Silver Comet Trail in Mableton, Cobb County, GA. The project consists of constructing a 10’ multi-use trail which begins at Hicks Rd and runs along the west side of Floyd Rd and ends at the Silver Comet Trail for a total length of 0.64 miles. Existing traffic lanes will not be impacted by

Project Information FAQ

Project Information

4 Q
The project “CR 2373/FLOYD RD FROM SILVER COMET TRAIL TO CR 2894/HICKS RD” is an infrastructure initiative in the Water Supply and Storage sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

CR 2373/Floyd Rd from Silver Comet Trail to CR 2894/Hicks Rd: along CR 2373/Floyd Rd from CR 2894/Hicks Rd to Silver Comet Trail in Mableton, Cobb County, GA. The project consists of constructing a 10’ multi-use trail which begins at Hicks Rd and runs along the west side of Floyd Rd and ends at the Silver Comet Trail for a total length of 0.64 miles. Existing traffic lanes will not be impacted by this project. There is an existing 24” curb and gutter and a 4’ to 5’ sidewalk throughout most of the corridor with exception to the first 70’ of the project, which has a 30” curb and gutter. Existing curb and gutter will be retained except where ADA ramps must be constructed. This proposed trail will be located on the west side of Floyd Rd, connecting the future trail to the Silver Comet Trail. There will be no pedestrian lighting, irrigation, or landscaping involved in this project. In order to minimize impacts to two properties, two short retaining walls are proposed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data