logo
ProjectComplete

CR 2373/FLOYD RD FROM SILVER COMET TRAIL TO CR 2894/HICKS RD

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

CR 2373/Floyd Rd from Silver Comet Trail to CR 2894/Hicks Rd: along CR 2373/Floyd Rd from CR 2894/Hicks Rd to Silver Comet Trail in Mableton, Cobb County, GA. The project consists of constructing a 10’ multi-use trail which begins at Hicks Rd and runs along the west side of Floyd Rd and ends at the Silver Comet Trail for a total length of 0.64 miles. Existing traffic lanes will not be impacted by

Status
Closed
Sector
Water Supply and Storage, Car parking, Road, Government, Automotive
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CR 2373/FLOYD RD FROM SILVER COMET TRAIL TO CR 2894/HICKS RD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CR 2373/FLOYD RD FROM SILVER COMET TRAIL TO CR 2894/HICKS RD” is an infrastructure initiative in the Water Supply and Storage sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

CR 2373/Floyd Rd from Silver Comet Trail to CR 2894/Hicks Rd: along CR 2373/Floyd Rd from CR 2894/Hicks Rd to Silver Comet Trail in Mableton, Cobb County, GA. The project consists of constructing a 10’ multi-use trail which begins at Hicks Rd and runs along the west side of Floyd Rd and ends at the Silver Comet Trail for a total length of 0.64 miles. Existing traffic lanes will not be impacted by this project. There is an existing 24” curb and gutter and a 4’ to 5’ sidewalk throughout most of the corridor with exception to the first 70’ of the project, which has a 30” curb and gutter. Existing curb and gutter will be retained except where ADA ramps must be constructed. This proposed trail will be located on the west side of Floyd Rd, connecting the future trail to the Silver Comet Trail. There will be no pedestrian lighting, irrigation, or landscaping involved in this project. In order to minimize impacts to two properties, two short retaining walls are proposed.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Road, Government, Automotive

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project