logo

CR 26/BETHEL ROAD @ HAT CREEK 6.7 MI SE OF SYCAMORE

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The project consists of the replacement of an existing bridge on CR 26/Bethel Road in Turner County, approximately 10 miles North of the city of Tifton. The proposed project begins approximately 300 feet Southeast of the existing bridge and extends Northwest of the existing bridge approximately 300 feet, for an approximate length of 600 feet (0.11 miles). Proposed is a new bridge that will be cons

Project Information FAQ

Project Information

4 Q
The project “CR 26/BETHEL ROAD @ HAT CREEK 6.7 MI SE OF SYCAMORE” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the replacement of an existing bridge on CR 26/Bethel Road in Turner County, approximately 10 miles North of the city of Tifton. The proposed project begins approximately 300 feet Southeast of the existing bridge and extends Northwest of the existing bridge approximately 300 feet, for an approximate length of 600 feet (0.11 miles). Proposed is a new bridge that will be constructed on the existing alignment. The bridge will be 120-feet long with two 11-foot lanes and 2-foot shoulders. The roadway typical section, based on a low traffic volume design, consists of two 11-foot lanes with 2-foot grass shoulder widths. The design speed of the project will be 55mph. Traffic will be maintained on an offsite detour.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data