logo

CR 279/COFFEE ROAD @ LITTLE CREEK 8 MI W OF MORVEN

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

A bridge replacement project located 8 miles west of Morven in Brooks County, Ga. The new bridge will be constructed on the existing alignment, while traffic is directed to an offsite detour. The existing roadway consists of two 11-foot lanes (one in each direction) with variable (1-foot typical) paved shoulders. The ROW width is 80-120 feet. The existing bridge is 136 feet long and 32.3 feet w

Project Information FAQ

Project Information

4 Q
The project “CR 279/COFFEE ROAD @ LITTLE CREEK 8 MI W OF MORVEN” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A bridge replacement project located 8 miles west of Morven in Brooks County, Ga. The new bridge will be constructed on the existing alignment, while traffic is directed to an offsite detour. The existing roadway consists of two 11-foot lanes (one in each direction) with variable (1-foot typical) paved shoulders. The ROW width is 80-120 feet. The existing bridge is 136 feet long and 32.3 feet wide. The proposed bridge will be 160-ft in length and consist of one 11-ft lane and 4-ft shoulder in each direction. The roadway typical section will consist of two 11-ft lanes with 5.5-ft shoulders and have a maintained posted speed limit of 50 mph. The proposed profile would provide the required clearance over the design flood and account for the deeper beam depth. The project begins approximately 0.16 miles west of the existing bridge and ends approximately 0.14 miles east along CR 279/Coffee Road for a total project length of approximately 0.32 miles.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data