CR 281/CEDAR CREEK ROAD @ CEDAR CREEK
Sector: Automotive • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This bridge (Structure ID 193-5039-0; County Road 281 over Cedar Creek) was built in 1988 and consists of a timber deck with steel spans on concrete caps and steel piles. The bridge was designed using a H-15 vehicle and the calculated load carrying capacity is 58.3 percent lower than current standards. This bridge is posted for weight restriction and the overall condition is classified as poor. Fu
- Status
- Under Construction
- Sector
- Automotive, Forest Products and Packaging, Bridge, Cement, Road, Steel, Government, Metal
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 281/CEDAR CREEK ROAD @ CEDAR CREEK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This bridge (Structure ID 193-5039-0; County Road 281 over Cedar Creek) was built in 1988 and consists of a timber deck with steel spans on concrete caps and steel piles. The bridge was designed using a H-15 vehicle and the calculated load carrying capacity is 58.3 percent lower than current standards. This bridge is posted for weight restriction and the overall condition is classified as poor. Further deterioration of these components will result in a reduction in the load carrying capacity. Due to the condition of the bridge, the load carrying capacity below current standards, and the posted weight restriction, replacement is necessary. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Automotive, Forest Products and Packaging, Bridge, Cement, Road, Steel, Government, Metal |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
