CR 286/CS 547/BLUE RIDGE STREET @ CS 524/MURPHY HWY
Sector: Road • Location: Blairsville, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project proposes to construct at roundabout at the intersection of Blue Ridge Street and Murphy Hwy in Blairsville to replace the 4-way stop sign controlled intersection. The project length is 0.50 miles.
- Status
- Under Construction
- Sector
- Road, Government
- Location
- Blairsville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 286/CS 547/BLUE RIDGE STREET @ CS 524/MURPHY HWY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project proposes to construct at roundabout at the intersection of Blue Ridge Street and Murphy Hwy in Blairsville to replace the 4-way stop sign controlled intersection. The project length is 0.50 miles. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Blairsville |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
