logo

CR 298/COFFEE ROAD @ AUCILLA RIVER

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project consists of the replacement of the existing CR 298/Coffee Road bridge over Aucilla River. The project is located 6.0 Miles West of Barwick in Thomas County. The length of the proposed project is approximately 0.40 miles. The proposed bridge will be replaced on the existing alignment and an off-site detour will be used for construction. Design features include one 11-foot lane and 4-fo

Project Information FAQ

Project Information

4 Q
The project “CR 298/COFFEE ROAD @ AUCILLA RIVER” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the replacement of the existing CR 298/Coffee Road bridge over Aucilla River. The project is located 6.0 Miles West of Barwick in Thomas County. The length of the proposed project is approximately 0.40 miles. The proposed bridge will be replaced on the existing alignment and an off-site detour will be used for construction. Design features include one 11-foot lane and 4-foot rural shoulders (2-foot paved) in each direction. The design speed is 55 mph. The proposed typical bridge section includes one 11- foot lane in each direction with 4-foot outside shoulders. The proposed bridge will be constructed on a new (~ 3 ft) raised profile to provide the required clearance over the Aucilla River.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data