CR 305/PALMER ROAD @ LITTLE OCHLOCKNEE RIVER OVERFLOW
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project would replace the bridge structure over Little Ochlocknee River overflow. The proposed project consists of reconstructing the bridge and adjacent roadway, utilizing an offsite detour for traffic. The total length of the project is approximately 0.20 miles. The proposed roadway consists of two 11-ft travel lanes with 6-ft shoulders (2-ft paved), guardrail, and side slopes varying from
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project would replace the bridge structure over Little Ochlocknee River overflow. The proposed project consists of reconstructing the bridge and adjacent roadway, utilizing an offsite detour for traffic. The total length of the project is approximately 0.20 miles. The proposed roadway consists of two 11-ft travel lanes with 6-ft shoulders (2-ft paved), guardrail, and side slopes varying from 4:1 to 2:1. The proposed bridge would be 168-ft long by 36-ft wide and would be constructed at the current location with the elevation lowered by approximately 1.5-ft. The proposed bridge also consists of 3 spans of 12 PSC box beams with an asphalt overlay. Traffic would be closed to both lanes in each direction and routed onto the proposed detour during the reconstruction of the new bridge structure (ID 275-0055-0). The proposed bridge will be constructed utilizing a temporary work bridge to the south of the permanent bridge. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
