logo

CR 321/TALIAFERRO SPRINGS @ CHATTOOGA RIVER 1 MI S OF LYERLY

Sector: Commercial • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

BR000-F003-00(081) is a bridge replacement project proposing the replacement of the existing substandard bridge where C.R. 321 crosses the Chattooga River in Chattooga County. The proposed roadway will consist of two 11ft travel lanes with 2ft shoulders at the approaches and two 11ft travel lanes with 3ft shoulders on the bridge. The GDOT road inventory mile post nearest the project is 3.27. Built

Project Information FAQ

Project Information

4 Q
The project “CR 321/TALIAFERRO SPRINGS @ CHATTOOGA RIVER 1 MI S OF LYERLY” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

BR000-F003-00(081) is a bridge replacement project proposing the replacement of the existing substandard bridge where C.R. 321 crosses the Chattooga River in Chattooga County. The proposed roadway will consist of two 11ft travel lanes with 2ft shoulders at the approaches and two 11ft travel lanes with 3ft shoulders on the bridge. The GDOT road inventory mile post nearest the project is 3.27. Built in 1955, this bridge has a posted load limit and a sufficiency rating of 20.63. The Office of Bridge Maintenance has determined that any structure with a sufficiency rating less than 50 should be replaced rather than improved. Therefore, this project will replace the existing bridge with a structurally adequate bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data