CR 373/RIVERSIDE PKWY FM S/TURNER MCCALL TO N ROME CONN
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project begins approximately 200 feet south of Turner McCall Boulevard and continue north on Riverside Parkway for 1.54 miles to the Veterans Memorial Parkway (North Rome Bypass). The project will construct four (4) lanes divide with a 20' wide raised median with curb and gutter and sidewalk north to Veterans Memorial Parkway (North Rome Bypass). The bridge at Turner McCall Boulevard will be r
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project begins approximately 200 feet south of Turner McCall Boulevard and continue north on Riverside Parkway for 1.54 miles to the Veterans Memorial Parkway (North Rome Bypass). The project will construct four (4) lanes divide with a 20' wide raised median with curb and gutter and sidewalk north to Veterans Memorial Parkway (North Rome Bypass). The bridge at Turner McCall Boulevard will be removed and an at-grade intersection will be constructed at Riverside Parkway and Turner McCall Boulevard. The bridge at Burwell Creek will be replaced. The propose 20 feet wide raised median will be widened to approximately 40 feet wide from just north of the Chieftains Museum to the Veteran Memorial Parkway (North Rome Bypass, to avoid as many oak trees as possible. Fifteen trees will be planted opposite the Chieftain Museum. Median Crossovers are currently proposed at the second driveway of the Welborn property and 1769 feet north from that point for a U-turn, at the first driveway entrance |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
