logo

CR 392/UPPER RIVERDALE ROAD @ FLINT RIVER

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The total project length is approximately 0.5 miles located approx. 0.5 miles east of Riverdale. The project will replace the existing four span bridge on County St.(CS) 392/Upper Riverdale Road at Flint Creek. The existing 128’ long bridge, Structure ID 063-0077-0, was built in 1962 and reconstructed in 1981, and consists of four 32-ft-long spans with an existing roadway of 64.2’ and deck width o

Status
Under Construction
Sector
Bridge, Car parking, Road, Government, Automotive
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CR 392/UPPER RIVERDALE ROAD @ FLINT RIVER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CR 392/UPPER RIVERDALE ROAD @ FLINT RIVER” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The total project length is approximately 0.5 miles located approx. 0.5 miles east of Riverdale. The project will replace the existing four span bridge on County St.(CS) 392/Upper Riverdale Road at Flint Creek. The existing 128’ long bridge, Structure ID 063-0077-0, was built in 1962 and reconstructed in 1981, and consists of four 32-ft-long spans with an existing roadway of 64.2’ and deck width of 78.4’. CS 392 is classified as an Urban Minor Arterial with a posted speed of 45 mph. The existing typical has four 10-foot lanes and one 14-foot center two-way left-turn lane, two lanes in each direction with 6’ sidewalks. The new bridge will be on existing alignment requiring staged construction. It is necessary to widen greater than a 5-lane section for staging. The new bridge will have a deck width of 93.5’ with five 12-foot lanes, two thru lanes in each direction, an extension of the eastbound 12-foot right turn lane, and one 14-foot center two-way left-turn lane, and 6.5’ sidewalks.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Road, Government, Automotive

Article published date

2024-03-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project