logo

CR 451/QUAKER ROAD @ BEAVER DAM CREEK

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project is located along CR 451/Quaker Road, approximately 6.7 miles northwest of the city of Waynesboro in Burke County, Georgia. This project would replace the existing bridge on Quaker Road over Beaver Dam Creek (Structure ID 033-0039-0). The project consists of rebuilding the bridge in place to minimize right-of-way and environmental impacts. The bridge will be closed, and traffic d

Status
Under Construction
Sector
Bridge, Road, Hydro
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CR 451/QUAKER ROAD @ BEAVER DAM CREEK

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “CR 451/QUAKER ROAD @ BEAVER DAM CREEK” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is located along CR 451/Quaker Road, approximately 6.7 miles northwest of the city of Waynesboro in Burke County, Georgia. This project would replace the existing bridge on Quaker Road over Beaver Dam Creek (Structure ID 033-0039-0). The project consists of rebuilding the bridge in place to minimize right-of-way and environmental impacts. The bridge will be closed, and traffic detoured using an offsite detour. The proposed typical section for the roadway consists of two 11-foot travel lanes (one in each direction) with 6-foot grassed shoulders. The proposed typical section for the bridge consists of two 11-foot travel lanes with 4-foot shoulders. The total project length is approximately 0.2 miles.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road, Hydro

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project