logo

CR 4/HERNDON ROAD @ BRIER CREEK

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project is part of the LIBP program to replace GDOT bridge 259-5001-0 located on CR 4/Herndon Road at Brier Creek in Stewart County. The project is located 8 miles south of Lumpkin, Georgia and has a proposed length of approximately 0.2 miles, beginning approximately 450 west of the existing bridge abutment and ending approximately 300 feet east of the existing bridge abutment. The pr

Project Information FAQ

Project Information

4 Q
The project “CR 4/HERNDON ROAD @ BRIER CREEK” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is part of the LIBP program to replace GDOT bridge 259-5001-0 located on CR 4/Herndon Road at Brier Creek in Stewart County. The project is located 8 miles south of Lumpkin, Georgia and has a proposed length of approximately 0.2 miles, beginning approximately 450 west of the existing bridge abutment and ending approximately 300 feet east of the existing bridge abutment. The proposed project consists of replacing the existing two-lane bridge with a new two-lane bridge over Brier Creek that is 105 feet long and 30 feet wide. The bridge will be constructed at the current location along the existing roadway centerline. The roadway approaches to the bridge will consist of 10-foot travel lanes and 6-foot shoulders (2-foot paved), and the bridge will consist of 10-foot travel lanes and 3.375-foot shoulders. An off-site detour would be utilized to accommodate traffic during construction. The estimated time for construction of this project is 12 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data