logo
ProjectUnder Construction

CR 511/BROWN BRIDGE RD @SNAPPING SHOALS CRK; INC REALIGNMENT

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

The bridge on Brown Bridge Road / CR 511 over Snapping Shoals Creek, Structure ID 217-0052-0, was built in 1963. The bridge consists of four (4) simple spans with reinforced concrete beams on concrete caps with steel piles. The bridge was designed using an H-15 vehicle, which is below current design standards. The overall condition of this bridge would be classified as good. The deck, superstr

Status
Under Construction
Sector
Automotive, Bridge, Cement, Road, Steel, Government, Metal
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CR 511/BROWN BRIDGE RD @SNAPPING SHOALS CRK; INC REALIGNMENT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CR 511/BROWN BRIDGE RD @SNAPPING SHOALS CRK; INC REALIGNMENT” is an infrastructure initiative in the Automotive sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The bridge on Brown Bridge Road / CR 511 over Snapping Shoals Creek, Structure ID 217-0052-0, was built in 1963. The bridge consists of four (4) simple spans with reinforced concrete beams on concrete caps with steel piles. The bridge was designed using an H-15 vehicle, which is below current design standards. The overall condition of this bridge would be classified as good. The deck, superstructure, and substructure are in good condition with some minor deterioration noted. The bridge is classified as having an unknown foundation and could be at risk for scour. The bridge is currently posted. Due to the structural integrity of the bridge pertaining to the design vehicle, the unknown foundation of the substructure, and the current posting requirements, replacement of the bridge is recommended.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Automotive, Bridge, Cement, Road, Steel, Government, Metal

Article published date

2024-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project