CR 511/CLARK ST FM CS 682/CARROLL ST TO CS 681/TURNERLAKE RD
Sector: Water Supply and Storage • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project will complete a pedestrian and bicycle connection between the Newton County Library and the Turner Lake Recreational Complex. Currently, Clark Street is a two lane road with 12 foot travel lanes and grassed shoulders in a 100 foot right-of-way. The pavement will be widened by 3 feet in each direction to include bicycle lanes and 24" curb and gutter will be added. Five foot wide sidewa
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Education, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 511/CLARK ST FM CS 682/CARROLL ST TO CS 681/TURNERLAKE RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will complete a pedestrian and bicycle connection between the Newton County Library and the Turner Lake Recreational Complex. Currently, Clark Street is a two lane road with 12 foot travel lanes and grassed shoulders in a 100 foot right-of-way. The pavement will be widened by 3 feet in each direction to include bicycle lanes and 24" curb and gutter will be added. Five foot wide sidewalks located 2 feet from the back of curb will be constructed wherever there are no existing sidewalks. Storm structures will be installed to convey storm water to existing roadside ditches. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Education, Road, Government, Automotive |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
