CR 5183/MAIN STREET FROM SR 236 TO SR 8/US 29 - LCI
Sector: Car parking • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed project provides pedestrian improvements in downtown Tucker, in DeKalb County. The project reduces the existing four travel lanes to two 14-foot-wide travel lanes (one in either direction) with 20-foot-wide angled parking, curb and gutter, and a 15.5-foot-wide pedestrian zone to include pedestrian lighting, benches, and trash receptacles. The design speed will be posted at 35 mph. Th
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 5183/MAIN STREET FROM SR 236 TO SR 8/US 29 - LCI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project provides pedestrian improvements in downtown Tucker, in DeKalb County. The project reduces the existing four travel lanes to two 14-foot-wide travel lanes (one in either direction) with 20-foot-wide angled parking, curb and gutter, and a 15.5-foot-wide pedestrian zone to include pedestrian lighting, benches, and trash receptacles. The design speed will be posted at 35 mph. The proposed right-of-way will remain at approximately 65 to 100 feet. However, approximately 0.124 acre of open land would be converted to right-of-way. Current on-street parking and two travel lanes (one in either direction) would be converted to accommodate the pedestrian zone. On-street parking would be re-constructed behind the pedestrian zone. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
