CR 5195/RAINBOW DRIVE FM SR 155 TO CR 442/COLUMBIA DRIVE
Sector: Car parking • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project includes the construction of a 5' wide sidewalk from Candler Road to Columbia Drive. Curb and gutter and urban drainage will be constructed in some areas where no curb and gutter currently exists. In order to construct the sidewalk along Rainbow Drive over Shoal Creek, the existing triple 10'x11' box culvert will be extended. Also included in the project is the re-alignment of the exis
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive, Waste Processing and Treatment
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 5195/RAINBOW DRIVE FM SR 155 TO CR 442/COLUMBIA DRIVE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the construction of a 5' wide sidewalk from Candler Road to Columbia Drive. Curb and gutter and urban drainage will be constructed in some areas where no curb and gutter currently exists. In order to construct the sidewalk along Rainbow Drive over Shoal Creek, the existing triple 10'x11' box culvert will be extended. Also included in the project is the re-alignment of the existing skewed intersection of Old Rainbow Drive, which will create a safer intersection for pedestrians and vehicular traffic. Project length 1.1 miles. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive, Waste Processing and Treatment |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
