CR 53/SHILOH; CR 458/MCFARLAND & CR 953/SHILOH EAST @ 3 LOCS
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
- McFarland Rd from Ronald Reagan Blvd to Shiloh Rd
- Shiloh Road from McFarland Rd to Shiloh East Rd
- Shiloh East Rd from Shiloh Rd to Yorkridge Dr
Installation of approximately 2.48 miles of sidewalk improvements. 5' sidewalks are proposed on the west shoulder of McFarland Rd and the north/west shoulder of Shiloh Rd. In addition, a 2.5' curb and gutter section will be added to the we
- Status
- Closed
- Sector
- Cement, Manufacturing (Industrial), Road, Waste Processing and Treatment, Car parking, Automotive, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 53/SHILOH; CR 458/MCFARLAND & CR 953/SHILOH EAST @ 3 LOCS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. McFarland Rd from Ronald Reagan Blvd to Shiloh Rd 2. Shiloh Road from McFarland Rd to Shiloh East Rd 3. Shiloh East Rd from Shiloh Rd to Yorkridge Dr Installation of approximately 2.48 miles of sidewalk improvements. 5' sidewalks are proposed on the west shoulder of McFarland Rd and the north/west shoulder of Shiloh Rd. In addition, a 2.5' curb and gutter section will be added to the west side of McFarland Rd, starting at the Greenway Access and extending south approximately 1120 LF to the intersection of McFarland/Shiloh. Additional drainage structures will be added as needed to the new curb and gutter section. A small 60 sq yd. concrete island for pedestrian refuge is proposed at the intersection of Shiloh/Corporate. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Cement, Manufacturing (Industrial), Road, Waste Processing and Treatment, Car parking, Automotive, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
