logo

CR 581/BETHSAIDA RD @ MORNING CREEK TRIBUTARY

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project is the replacement of a structurally deficient bridge on C.R. 581/Bethsaida Rd over Morning Creek Tributary, 3.4 miles east of Union City, Georgia. The existing bridge, constructed in 1952, is load limited with a sufficiency rating of 12. This project proposes to construct a new concrete bridge over Morning Creek Tributary at the existing bridge site. The new approaches will consist o

Project Information FAQ

Project Information

4 Q
The project “CR 581/BETHSAIDA RD @ MORNING CREEK TRIBUTARY” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is the replacement of a structurally deficient bridge on C.R. 581/Bethsaida Rd over Morning Creek Tributary, 3.4 miles east of Union City, Georgia. The existing bridge, constructed in 1952, is load limited with a sufficiency rating of 12. This project proposes to construct a new concrete bridge over Morning Creek Tributary at the existing bridge site. The new approaches will consist of two, 12' lanes with 4' bike lanes, 10' urban shoulders that include 2.5' curb and gutter, and a 5' sidewalk. The bridge typical section will consist of two, 12' lanes in each direction with 4' bike lane and 6' sidewalks. The construction will be staged with two lanes being maintained on the existing bridge while a portion of the new bridge is constructed parallel to the existing bridge. Traffic will be routed on the new structure. The remaining portion of the new bridge will be constructed after the demolition of the existing structure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data