logo

CR 59/FRIENDSHIP CHURCH ROAD @ ALLIGATOR CREEK

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

Bridge Replacement of Friendship Church Road at Alligator Creek. This bridge is structurally deficient and requires posting due to heavy scour on both abutments, vertical cracking on and between beams and deck abrasion. This project is part of the Low Impact Bridge Program (LIBP) that will replace the existing bridge on CR 59/Friendship Church Road over Alligator Creek approximately 7 miles northw

Project Information FAQ

Project Information

3 Q
The project “CR 59/FRIENDSHIP CHURCH ROAD @ ALLIGATOR CREEK” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bridge Replacement of Friendship Church Road at Alligator Creek. This bridge is structurally deficient and requires posting due to heavy scour on both abutments, vertical cracking on and between beams and deck abrasion. This project is part of the Low Impact Bridge Program (LIBP) that will replace the existing bridge on CR 59/Friendship Church Road over Alligator Creek approximately 7 miles northwest of Jacksonville, Georgia. The proposed roadway typical section consists of two 10-foot travel lanes, one in each direction, with 4-foot shoulders (2-ft paved). The proposed two-lane bridge will be 33 feet, out to out width, and 120 feet in length. The project has an approximately total project length of 0.20 miles. The new bridge will be closed at the same location as the existing bridge. The bridge will be closed during construction and traffic will be directed to an offsite detour approximately 6 months. Total construction time will be approximately 12 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data