CR 675 at Rye Road Intersection Improvements
Sector: Broadband • Location: Bradenton, Florida, United States of America
Source: Dodge USA
Design and construct a span wire traffic signal at the CR 675 and Rye Road intersection, add/lengthen turn lanes, intersection lighting, construct pedestrian ramps and crosswalks. The traffic signal will be a diagonal span wire design and provide wireless communication to connect traffic signal to the County's central signal system software.
- Status
- Prospective
- Sector
- Broadband, Car parking, Road, Automotive, Government, Commercial, Telecommunications
- Location
- Bradenton, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CR 675 at Rye Road Intersection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and construct a span wire traffic signal at the CR 675 and Rye Road intersection, add/lengthen turn lanes, intersection lighting, construct pedestrian ramps and crosswalks. The traffic signal will be a diagonal span wire design and provide wireless communication to connect traffic signal to the County's central signal system software. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Bradenton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Car parking, Road, Automotive, Government, Commercial, Telecommunications |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
