logo

CR 717/SARDIS CHURCH RD EXT FM E OF SKIPPER RD OF TO SR 247

Sector: Airport • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project begins approximately 1100' east of Skipper Road where it ties into the I-75/Sardis Church Rd Interchange Project, NH-75-1(246). The project will construct a 4-lane, divided east-west connector between Skipper Rd and SR 247/US 129 (20-ft raised, concrete median, 4-ft bike lanes, curb and gutter and 5-ft sidewalks on both sides of the roadway). The project widens existing Sardis Church

Project Information FAQ

Project Information

4 Q
The project “CR 717/SARDIS CHURCH RD EXT FM E OF SKIPPER RD OF TO SR 247” is an infrastructure initiative in the Airport sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project begins approximately 1100' east of Skipper Road where it ties into the I-75/Sardis Church Rd Interchange Project, NH-75-1(246). The project will construct a 4-lane, divided east-west connector between Skipper Rd and SR 247/US 129 (20-ft raised, concrete median, 4-ft bike lanes, curb and gutter and 5-ft sidewalks on both sides of the roadway). The project widens existing Sardis Church Rd from 1100' east of Skipper Rd east approx. 0.85 miles, turns south on new location for 3.8 miles, and connects to existing Avondale Mill Rd at the southwest corner of the airport. Avondale Mill Rd will be widened to match the typical section referenced above for the remaining 1.7 miles of the project A trumpet interchange will be constructed at the existing intersection of Avondale Mill Rd with SR 247/US 129 to accommodate the projected heavy northbound SR 247/US 129 to westbound Avondale Mill Rd afternoon traffic. The total length of the project is 6.3 miles. SPLOST Project MCN-L25.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data