logo

CR 77/ETHERIDGE MILL ROAD @ POTATO CREEK 2 MI W OF MILNER

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

Pl No. 0019122 in Lamar County will replace the existing 102-foot-wide bridge built in 1978 over Potato Creek. The total project length is approximately 0.3 miles. The proposed 110-foot­wide bridge will be designed for two 10-foot-wide lanes with 3.375-foot-wide shoulders. The bridge approaches will consist of one 10-foot-wide lane with 6-foot-wide rural shoulders in both directions, 2-foot being

Status
Under Construction
Sector
Bridge, Road, Hydro
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CR 77/ETHERIDGE MILL ROAD @ POTATO CREEK 2 MI W OF MILNER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “CR 77/ETHERIDGE MILL ROAD @ POTATO CREEK 2 MI W OF MILNER” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Pl No. 0019122 in Lamar County will replace the existing 102-foot-wide bridge built in 1978 over Potato Creek. The total project length is approximately 0.3 miles. The proposed 110-foot­wide bridge will be designed for two 10-foot-wide lanes with 3.375-foot-wide shoulders. The bridge approaches will consist of one 10-foot-wide lane with 6-foot-wide rural shoulders in both directions, 2-foot being paved. The proposed alignment will be shifted to the northeast of the existing alignment to avoid environmental impacts including impacts to the existing historical dam and will be raised approximately 4-feet. Traffic will be maintained via an off-site detour. The estimated detour time is approximately 12-18 months but may vary depending on construction methods and timing. The design speed will be 45 mph.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road, Hydro

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project