CR 82/CS 755/DAVIS RD @ 1 LOC & CS 584/SHIELDS RD @ 1 LOC
Sector: Consumer Products • Location: Stockbridge, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Davis Road & South Berry Street sidewalks; (1) Davis Road beginning at North Henry Blvd/SR42 / SR138/ US23 & ending at Creek Circle/ Clark Park; will construct a sidewalk along the south & west side of Davis Rd starting at Creek Circle at Clark Park & ending at Shields Rd (approx. 4000 feet). (2) Sidewalk will also be constructed along South Berry St. from 2nd St. to Railroad St. (approx. 550 feet
- Status
- Closed
- Sector
- Consumer Products, Car parking, Rail, Road, Government, Automotive
- Location
- Stockbridge, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CR 82/CS 755/DAVIS RD @ 1 LOC & CS 584/SHIELDS RD @ 1 LOC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Davis Road & South Berry Street sidewalks; (1) Davis Road beginning at North Henry Blvd/SR42 / SR138/ US23 & ending at Creek Circle/ Clark Park; will construct a sidewalk along the south & west side of Davis Rd starting at Creek Circle at Clark Park & ending at Shields Rd (approx. 4000 feet). (2) Sidewalk will also be constructed along South Berry St. from 2nd St. to Railroad St. (approx. 550 feet). Both will be 6-feet wide. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Stockbridge |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Car parking, Rail, Road, Government, Automotive |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
