CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER

Construction work program · Georgia

Source: Georgia Department of Transportation (GDOT)

This project replaces the existing bridge on CR 92 over the Hudson River in Banks County.  

This project will replace the existing 142-ft length bridge built in 1960 over the Hudson River. The proposed 156-ft length bridge will be designed for two 10-ft lanes and 2-ft shoulders. The bridge approaches will consist of one 10-ft lane in each direction and 6-ft rural shoulders, 2-ft being paved. T

Status
Under Construction
Sector
Bridge, Road, Government, Manufacturing (Industrial)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project replaces the existing bridge on CR 92 over the Hudson River in Banks County.   This project will replace the existing 142-ft length bridge built in 1960 over the Hudson River. The proposed 156-ft length bridge will be designed for two 10-ft lanes and 2-ft shoulders. The bridge approaches will consist of one 10-ft lane in each direction and 6-ft rural shoulders, 2-ft being paved. The bridge will be raised approximately 4-ft to provide proper freeboard clearance over the design year flood elevation and to accommodate proposed beam depths. The proposed bridge will be constructed on the existing alignment. The total project length is 0.3 miles. Right-of-way impacts will be reduced by constructing 2:1 foreslopes with guardrail where necessary. Off-site detour is planned. Construction is estimated to be 15 months.

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road, Government, Manufacturing (Industrial)

Article published date

2024-01-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project