logo

CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project replaces the existing bridge on CR 92 over the Hudson River in Banks County. This project will replace the existing 142-ft length bridge built in 1960 over the Hudson River. The proposed 156-ft length bridge will be designed for two 10-ft lanes and 2-ft shoulders. The bridge approaches will consist of one 10-ft lane in each direction and 6-ft rural shoulders, 2-ft being paved. The br

Project Information FAQ

Project Information

3 Q
The project “CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project replaces the existing bridge on CR 92 over the Hudson River in Banks County. This project will replace the existing 142-ft length bridge built in 1960 over the Hudson River. The proposed 156-ft length bridge will be designed for two 10-ft lanes and 2-ft shoulders. The bridge approaches will consist of one 10-ft lane in each direction and 6-ft rural shoulders, 2-ft being paved. The bridge will be raised approximately 4-ft to provide proper freeboard clearance over the design year flood elevation and to accommodate proposed beam depths. The proposed bridge will be constructed on the existing alignment. The total project length is 0.3 miles. Right-of-way impacts will be reduced by constructing 2:1 foreslopes with guardrail where necessary.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data