CR#472 Bridge & Approaches
Sector: Bridge • Location: Quitman, Mississippi, United States of America
Source: Dodge USA
Principal Items of Work are Approximately as Follows: Roadway Items Mobilization Lump Sum L.S. Clearing and Grubbing Lump Sum L.S. Removal of Bridge @ Station 14+00 1.0 Unit Unclassified Excavation (F.M.) 1,981.00 Cu. Yd. Borrow Excavation (F.M.E.) (Contractor Furnished) (Class 9) 1,754.00 Cu. Yd. Crushed Stone, Size 825 1,000.00 Ton Roadway Construction Surveying Lump Sum L.S. Right-of-Way Marker
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Principal Items of Work are Approximately as Follows: Roadway Items Mobilization Lump Sum L.S. Clearing and Grubbing Lump Sum L.S. Removal of Bridge @ Station 14+00 1.0 Unit Unclassified Excavation (F.M.) 1,981.00 Cu. Yd. Borrow Excavation (F.M.E.) (Contractor Furnished) (Class 9) 1,754.00 Cu. Yd. Crushed Stone, Size 825 1,000.00 Ton Roadway Construction Surveying Lump Sum L.S. Right-of-Way Markers (Type II) 16.00 Each Maintenance of Traffic Lump Sum L.S. Additional Construction Signs 0.00 Sq... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America
- Silverado Canyon Road Bridge ( 55C - 0175 ) Replacement
- Modjeska Canyon Road Bridge ( 55C0172 ) Retrofit
- Application of the California Rapid Assessment Method on Strawberry Creek
- Nine Ten Place
- Clinton Keith Extension Project
- Chuckwalla Valley Road Bridge
- Jurupa Grade Separation
- Center St & Stephens Ave Resurfacing
