Crac Building / URBAN architectes
Sector: Steel
Source: ArchDaily
Following a digital scan of the entire facade, dozens of prefabricated wood panels were fixed to the existing balconies, revealing the whole volume in just a few days.« Crac » is a public management organization located in the heart of the city. The project involved energy and aesthetic renovation of the building envelope while maintaining the building's activity. Ultimately, the operation reduced
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Following a digital scan of the entire facade, dozens of prefabricated wood panels were fixed to the existing balconies, revealing the whole volume in just a few days.« Crac » is a public management organization located in the heart of the city. The project involved energy and aesthetic renovation of the building envelope while maintaining the building's activity. Ultimately, the operation reduced the building's energy consumption for heating and cooling by a ratio of 1 to 10! These performances are now better than those required for a new building.The contrast between aluminum and yellow highlights the entrance device and sunshades. The inside of the skin, in contact with the building's interior spaces, is warmer: the interior fir wood finishes contrast with the technological character of the exterior façade, offering a soothing dimension to the spaces. The construction of a series of furniture units integrated into the facade takes advantage of the interstitial space, offering occupants new storage facilities.The construction concept was based on a simple idea: to wrap the entire building in a new prefabricated insulating skin, without touching the existing façade. This meant that employees could remain in the building while avoiding the costs of moving twice and having to stop work.The project also gives the building a new architectural expression, fully consistent with its construction system. The materials used are simple, and light and emphasize the connections between the panels.All the building's new technology was placed in the gap created between the old and new facades, to enable the occupants to continue working in the best possible conditions. The existing façade was dismantled and removed as soon as the new façade was operational. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
