logo
ProjectClosed

Crac Building / URBAN architectes

Sector: Steel

Source: ArchDaily

Following a digital scan of the entire facade, dozens of prefabricated wood panels were fixed to the existing balconies, revealing the whole volume in just a few days.« Crac » is a public management organization located in the heart of the city. The project involved energy and aesthetic renovation of the building envelope while maintaining the building's activity. Ultimately, the operation reduced

Status
Closed
Sector
Steel, Metal, Residential, Commercial
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Crac Building / URBAN architectes

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Crac Building / URBAN architectes” is an infrastructure initiative in the Steel sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Following a digital scan of the entire facade, dozens of prefabricated wood panels were fixed to the existing balconies, revealing the whole volume in just a few days.« Crac » is a public management organization located in the heart of the city. The project involved energy and aesthetic renovation of the building envelope while maintaining the building's activity. Ultimately, the operation reduced the building's energy consumption for heating and cooling by a ratio of 1 to 10! These performances are now better than those required for a new building.The contrast between aluminum and yellow highlights the entrance device and sunshades. The inside of the skin, in contact with the building's interior spaces, is warmer: the interior fir wood finishes contrast with the technological character of the exterior façade, offering a soothing dimension to the spaces. The construction of a series of furniture units integrated into the facade takes advantage of the interstitial space, offering occupants new storage facilities.The construction concept was based on a simple idea: to wrap the entire building in a new prefabricated insulating skin, without touching the existing façade. This meant that employees could remain in the building while avoiding the costs of moving twice and having to stop work.The project also gives the building a new architectural expression, fully consistent with its construction system. The materials used are simple, and light and emphasize the connections between the panels.All the building's new technology was placed in the gap created between the old and new facades, to enable the occupants to continue working in the best possible conditions. The existing façade was dismantled and removed as soon as the new façade was operational.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Steel, Metal, Residential, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project