Craig Road Sanitary Sewer - Phase 1
Sector: Water Supply and Storage • Location: Spokane, Washington, United States of America
Source: Dodge USA
Work generally consists of installing new sewer system including sanitary sewer pipes, manholes, existing sanitary sewer utility connections, trenching and backfilling, temporary erosion control, construction of gravel road, seeding, mulching and other miscellaneous items. The anticipated NTP date is April 15, 2025 and the project must be completed in one hundred and twenty (120) calendar day
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- Spokane, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Craig Road Sanitary Sewer - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work generally consists of installing new sewer system including sanitary sewer pipes, manholes, existing sanitary sewer utility connections, trenching and backfilling, temporary erosion control, construction of gravel road, seeding, mulching and other miscellaneous items. The anticipated NTP date is April 15, 2025 and the project must be completed in one hundred and twenty (120) calendar day |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Spokane |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
