Crane Hill Road Bridge # 202/128 Rehabilitation
Sector: Steel • Location: Sugar Hill, New Hampshire, United States of America
Source: Dodge
bridge engineering study, design, permitting, bidding and construction phase services. construction inspection will be thru a separate firm. The following bridge in the Town of Sugar Hill is scheduled for rehabilitation or replacement under the State Bridge Aid Program and the Municipal Off System Federal Bridge Aid Program created under a federal law known as FAST-ACT Fixing Americas Surface Tran
- Status
- Closed
- Sector
- Steel, Bridge, Road, Commercial, Government, Metal
- Location
- Sugar Hill, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Crane Hill Road Bridge # 202/128 Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | bridge engineering study, design, permitting, bidding and construction phase services. construction inspection will be thru a separate firm. The following bridge in the Town of Sugar Hill is scheduled for rehabilitation or replacement under the State Bridge Aid Program and the Municipal Off System Federal Bridge Aid Program created under a federal law known as FAST-ACT Fixing Americas Surface Transportation System Act. Crane Hill Bridge over Gale River Br. 202/128 Warren Truss Steel Bridge, S... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Sugar Hill |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Bridge, Road, Commercial, Government, Metal |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
