Crawford County Industrial Drive Reconstruction
Sector: Water Supply and Storage • Location: Grayling, Michigan, United States of America
Source: Dodge
4.14 miles of roadway reconstruction and new roadway construction on Industrial Drive. Commencing at a point 3,900 feet south of M-72, thence south 4.14 miles to the Intersection of 4 Mile Road. Items of work include clearing, excavation, embankment, road subbase, aggregate base, HMA base crushing and shaping, storm sewer, concrete curb and gutter, HMA paving, aggregate shoulder, ditching, pavemen
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Road
- Location
- Grayling, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Crawford County Industrial Drive Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 4.14 miles of roadway reconstruction and new roadway construction on Industrial Drive. Commencing at a point 3,900 feet south of M-72, thence south 4.14 miles to the Intersection of 4 Mile Road. Items of work include clearing, excavation, embankment, road subbase, aggregate base, HMA base crushing and shaping, storm sewer, concrete curb and gutter, HMA paving, aggregate shoulder, ditching, pavement markings, permanent signage, slope restoration, and traffic control. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Grayling |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Road |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
